Account Login

Login:

Password:


News Flash

September 2008 - Wordpress upgrade
Wordpress 2.6.x now available as pre-installed application!
Read more...
 
Home arrow Home arrow News arrow July 2008 - Datacenter specs
July 2008 - Datacenter specs

Recently we are getting more and more inquiries regarding the specifications of the three Datacenters.

So, we decided to put them here for easy reference:

Dallas:

----------------------------------------------
Internet connection:

Global Crossing - 10GBit
Internap - 10GBit
Level3 - 10GBit
Savvis - 10GBit
Verio/NTT 1 - 10GBit
Verio/NTT 2 - 10GBit

Facility:
6000 amps 480v Input Power
6 x 750Kva UPS Battery Backup Units
3 x 2000Kw Diesel Generator with Onsite Fuel Storage
Redundant Liebert 30 Ton HVAC Units
Pre-Action Dry Pipe Fire Suppression
Proximity Security Badge Access
Digital Security Video Surveillance

Seattle:

------------------------------------------------------
Connectivity:

Internap 1 - 10GBit
Internap 2 - 10GBit
Qwest - 10GBit

Facility:

2000 amps 480v Input Power
4 x 500Kva UPS Battery Backup Units
2000Kw Diesel Generator with Onsite Fuel Storage
Redundant Liebert 30 Ton HVAC Units
Pre-Action Dry Pipe Fire Suppression
Proximity Security Badge Access
Digital Security Video Surveillance

Washington,DC:

----------------------------------------------------
Conectivity:

Internap 1 - 10GBit
Internap 2 - 10GBit

Facility:

34 x 480v 3-Phase PDUs
8 x 750Kva UPS battery backup inits
3 x 2-megawatt diesel generators w/on-site fuel storage
Redundant 30-ton CRAC units
FM-200 Fire Suppression System with VESDA
Biometric Security System
Digital Security Video Surveillance

 
< Prev   Next >